Metallurgy and Machinery
Metallurgy and Machinery

     Our company performs all types of design work for new construction, reconstruction, overhaul and technical re-equipment of the following industries:

 

  • Agglomeration.
  • Smelting. 
  • Steelmaking.        
  • Rolling.
  • Auxiliary.

 

     Our experience includes more than 150 successful projects at the largest metallurgical enterprises. In recent years, our company has played a key role in the implementation of such major projects as:

 

  • Construction of a converter shop complex and a continuous casting machine at PJSC Alchevsk Iron and Steel Works (Alchevsk, Luhansk Region, Ukraine).
  • Reconstruction of the electric steelmaking shop of PJSC Energomashspetsstal (Kramatorsk, Donetsk Region, Ukraine).
  • Reconstruction of the blast furnace shop with the construction of a complex for the preparation and injection of pulverized coal fuel into blast furnaces at PJSC Dniprovskiy Metallurgical Plant (Dniprodzerzhinsk, Dnipro Region, Ukraine).
  • Construction of the second stage structures of the gas turbine combined cycle power plant of PJSC "Alchevsk Metallurgical Plant" (Alchevsk, Luhansk Region, Ukraine).
  • Overhaul of blast furnace No. 1 at PJSC Alchevsk Iron and Steel Works (Alchevsk, Luhansk Region, Ukraine).
  • Overhaul of blast furnace No. 4 at PJSC Ilyich Iron and Steel Works of Mariupol.
  • Reconstruction of the open-hearth shop with the installation of a 50-ton steelmaking furnace at PJSC Novokramatorsk Machine-Building Plant (Kramatorsk, Donetsk Region, Ukraine).
  • Construction of Blast Furnace Complex No. 5 at PJSC Yenakiieve Steel (Yenakiieve, Donetsk Region, Ukraine).
  • PJSC Poltava Mining and Processing Plant (Horishni Plavni, Poltava Region, Ukraine).

 

     We should also mention the projects in which PSK-KHARKIV LLC acted as a general designer:

 

  • Construction of an electric exhaust station at PJSC Alchevsk Metallurgical Plant (Alchevsk, Luhansk Region, Ukraine).
  • Construction of a 15-ton arc steelmaking furnace complex at PJSC Novokramatorsk Machine-Building Plant (Kramatorsk, Donetsk Region, Ukraine).
  • Reconstruction of the recycling water supply cycles of the ladle-furnace unit of the continuous casting machine No. 1 at PJSC Yenakiieve Steel Plant (Yenakiieve, Donetsk Region, Ukraine).
  • Increasing the productivity of the ladle-furnace No. 2 of PJSC Yenakiieve Steel Plant (Yenakiieve, Donetsk Region, Ukraine).

 

Construction of electric-furnace melting shop for Abinsk Electrical Metallurgical Plant, LLC

 

 Construction of complex of coal treatment and injection into blast furnace for Dnepr Iron & Steel Works, PJSC

 

 Construction of converter plant for Alchevsk Iron & Steel Works, PJSC

 

 Pump house for blast-furnace cooling system No. 1 for Alchevsk Iron & Steel Works, PJSC

 

 Construction of Sukhodol Plant for Special Heavy Machine Building